Digging a foundation: what it costs, step by step
The situation
From a building permit to a subgrade ready for footings, with equipment, trucks, weather and inspections. The process has 16 steps and involves 6 teams: Site superintendent, Survey crew, Excavation crew, Geotechnical engineer, Trucking and Quality control. The example assumes about 32 foundations a year.
The map
Download (PNG) SVG 16 steps, 6 teams. The PNG is readable at full size.
The figures
Cost per case
$10,549–$31,310
$337.6K–$1.0M per year
Waste per case
$3,959
$126.7K per year
Lead time, 80% of cases
4.2–5.6 wk
simulation of 500 cases
Figures for a business of 10–50 people, 32 foundations a year. For yours, open the template and choose “Make it mine”.
A what-if to try
“Survey crew records the as-built”: The survey crew writes the as-built straight from the instrument, so the superintendent only checks it. This what-if is saved in the template: open it to see its effect on the cost.
Open this template: Dig a foundation No sign-up. The map opens with these figures. See it animated on the home page →